About the project
Podravina is INA Naftaplin project, which comprises facilities and systems for gas and other hydrocarbonates production, originating from northwest Panon Area of approximately 250 km2. About fifty oil/gas wells, five gas stations (Stari Gradac, Kalinovac Istok, Kalinovac IP, Kalinovac Zapad i Molve Istok) and central gas treatment stations Molve 1, Molve 2 and Molve 3, yield annual gas production of 2.5 billions m3.
Control system is based on communication network connecting some thirty ABB Master and Advant controllers and operator stations.
Scope of activities
Development and commissioning of complete application (all controllers and operator stations) for central gas treatment station Molve III was completed by Intea engineers.
Activities included:
-
software design
-
programming - level 1: (databases and type circuits in controllers)
-
programming - level 2: (logic, sequences)
-
visualization - MasterView and Advant OS: configuration, application, process displays and dialogs development
-
simulation programs
-
Factory Acceptance Test with customer
-
site installation (partly)
-
commissioning
-
operator training
Other controllers were installed, mostly, in period 1987 - 1992. Intea engineers have been involved (until 1991. as Končar company employees) in Podravina project since the very beginning of ABB control system installation.
2001. CPS Molve III Step-up project. ABB Master equipment has been replaced with ABB Advant equipment. Application for new ABB Advant operator stations has been developed by Intea.