HPP Manantali - Mali

About the Plant
Manantali consists of the Manantali dam on the Bafing river, a power station and a network of transmission lines. The dam is 1460m long and 65m high. It created a reservoir with a storage capacity 11,3 million m3 and a surface of 477km2.
200MW hydro power plant consists of:

  • 5 units - 40MW each and
  • 2 switchyards - 225kV and 90kV.

Three 225kV lines run to Bamako (Mali capital, 322km), Dakar (Senegal, 820km) and Nouakchott (Mauritania capital) (226km). One 90kV line connects Manantali HPP and a town of Kaedi (Mali, 87km).

About the Control System
Scope
Entire power plant is controlled by ABB DCS - process controllers and runs fully automatic. Supervision and control includes turbines, generators, breakers, transformers, subsystems, e.g.:

  • 5 unit groups
  • 2 high-voltage switchyards
  • water intake gates
  • auxiliaries

Number of wired I/O signals: 3700.

Configuration

  • Process controllers - AdvantController 410 (8 units)
  • Process controllers - AdvantController 70 (5 units)
  • Operator stations - AdvantStation 500 OS (3 units)
  • Control network MasterBus 300, Plant Network TCP/IP
  • Event/alarm printers, hardcopy printers and report printers.

INTEA Scope

  • process controllers application design, programming and testing
  • operator stations application design and customizing
  • factory acceptance test with client

INTEA Chronology

  • May 2000 – August 2000, process controller and operator station - application design, programming and FAT with the client.



© 2010 Intea [ print verzija ]